国产黄色一区-欧美少妇诱惑-亚洲国产中文在线视频-久久精品爱-国产婷婷综合在线视频中文-亚洲最大成人网站-亚洲五月天综合-色无极亚洲-乌克兰粉嫩xxx极品hd-免费视频国产-国产精品极品在线视频-亚洲精品无码专区久久久-国产亚洲精品aaaa片app-奇米四色在线观看-久久久久青草大香综合精品-91成人精品一区在线播放-波多野结衣日韩-天堂色区-亚洲日本va午夜中文字幕-欧亚精品一区三区免费

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標(biāo)題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.